Pre-assembly inspection of the rotor within the base ring factory
New Type Cooler for Generator Upper Guide
On-site Pre-assembly of Water Guide Mechanism at Huaneng Lengzhuguan Power Plant, 65 MW Unit
Construction for the Renovation of the Inlet Gate of the Draft Tube for a 200 MW Single-Unit Turbine
In-house Maintenance and Construction Work for Various Types of Wheel Factories
Top Cover Coating
Single-unit 50 MW Runner Rework and Factory Maintenance Construction
Single-unit 40 MW Kaplan turbine runner returned to factory for overhaul and on-site assembly at the repair facility.
In-house Repair and Welding of the Runner at the 18 MW State Grid Tongzhong Power Station
Single-unit 27MW China Gezhouba Double River Hydropower Plant Water Conveyance System Pre-assembly in Factory
Static Balance Test of Impulse Runner in Factory
Batch Maintenance of Impulse Turbine Rotors
Factory-Internal Static Balance Test for a Single 4 MW Axial Fixed-Pitch Runner
On-site Pre-assembly of Water Guidance Mechanism at China Guodian Yunnan Miaolin Power Plant, Single Unit Capacity 32.5 MW
The 35 MW single-unit water guiding mechanism and runner repair work at Huadian Xinjiang Dakqulike Power Plant has been completed and the equipment has been dispatched from the factory.
40 MW Single-Unit Turbine Runner