Pre-assembly inspection of the rotor within the base ring factory

Pre-assembly inspection of the rotor within the base ring factory

New Type Cooler for Generator Upper Guide

New Type Cooler for Generator Upper Guide

On-site Pre-assembly of Water Guide Mechanism at Huaneng Lengzhuguan Power Plant, 65 MW Unit

On-site Pre-assembly of Water Guide Mechanism at Huaneng Lengzhuguan Power Plant, 65 MW Unit

Construction for the Renovation of the Inlet Gate of the Draft Tube for a 200 MW Single-Unit Turbine

Construction for the Renovation of the Inlet Gate of the Draft Tube for a 200 MW Single-Unit Turbine

In-house Maintenance and Construction Work for Various Types of Wheel Factories

In-house Maintenance and Construction Work for Various Types of Wheel Factories

Top Cover Coating

Top Cover Coating

Single-unit 50 MW Runner Rework and Factory Maintenance Construction

Single-unit 50 MW Runner Rework and Factory Maintenance Construction

Single-unit 40 MW Kaplan turbine runner returned to factory for overhaul and on-site assembly at the repair facility.

Single-unit 40 MW Kaplan turbine runner returned to factory for overhaul and on-site assembly at the repair facility.

In-house Repair and Welding of the Runner at the 18 MW State Grid Tongzhong Power Station

In-house Repair and Welding of the Runner at the 18 MW State Grid Tongzhong Power Station

Single-unit 27MW China Gezhouba Double River Hydropower Plant Water Conveyance System Pre-assembly in Factory

Single-unit 27MW China Gezhouba Double River Hydropower Plant Water Conveyance System Pre-assembly in Factory

Static Balance Test of Impulse Runner in Factory

Static Balance Test of Impulse Runner in Factory

Batch Maintenance of Impulse Turbine Rotors

Batch Maintenance of Impulse Turbine Rotors

Factory-Internal Static Balance Test for a Single 4 MW Axial Fixed-Pitch Runner

Factory-Internal Static Balance Test for a Single 4 MW Axial Fixed-Pitch Runner

On-site Pre-assembly of Water Guidance Mechanism at China Guodian Yunnan Miaolin Power Plant, Single Unit Capacity 32.5 MW

On-site Pre-assembly of Water Guidance Mechanism at China Guodian Yunnan Miaolin Power Plant, Single Unit Capacity 32.5 MW

The 35 MW single-unit water guiding mechanism and runner repair work at Huadian Xinjiang Dakqulike Power Plant has been completed and the equipment has been dispatched from the factory.

The 35 MW single-unit water guiding mechanism and runner repair work at Huadian Xinjiang Dakqulike Power Plant has been completed and the equipment has been dispatched from the factory.

40 MW Single-Unit Turbine Runner

40 MW Single-Unit Turbine Runner